Standard 019 Update Briefing Version 1 Network Rail Safety Vision Safety… we have committed to eliminating workforce fatalities and all major injuries. I know that improving workforce safety is not only the right thing to do from a moral and ethical perspective, it's also good business. Safety and performance go hand in hand. My belief in this approach led to the launch of our Safety Vision and the refresh of our Lifesaving Rules. Mark Carne Standard 019 Update Briefing 2 Why? 14 November 2014 22 January 2014 December 2012 21:45 hrs 11:34 13:50 hrs Garnant Branch line in Newark North Gate station Saxilby, near Lincoln Carmarthenshire Standard 019 Update Briefing 3 Background Standard 019 Update Briefing 4 Background Old Standard: Ref: NR/L2/OHS/019 Issue: 8 Date: 04 September 2010 Compliance date: 04 September 2010 Revised Standard: Ref: NR/L2/OHS/019 Issue: 9 Date: 03 July 2017 Compliance date: 03 July 2017 Standard 019 Update Briefing 5 Affected Parties Responsible Manager Standard 019 Update Briefing Planner Individual Working Alone (IWA) Controller of Site Safety (COSS) Safe Work Leader (SWL) – Note: IP only 6 What’s new? The person in charge The person in charge is a new capability, not a competence The person in charge will be appointed by the Responsible Manager on their ability to manage the work activity planned and have an understanding of the risks The person in charge will make sure that all risk controls have been implemented The person in charge must hold a COSS competence and may act as the COSS or delegate the COSS duties The person in charge and the planner will collaborate to produce the Safe Work Pack (SWP), which the person in charge will verify. Standard 019 Update Briefing 7 What’s new? Safe Work Pack (SWP) The SWP provides information on how work is to be carried out safely and gives details on how to manage and control task, site and operational risks. It enables effective management and implementation of controls for the safety of people involved, or who might be affected by the work activities on or near the line, or which might affect the line. SWP refers to the documentation provided to the person in charge for the work they are to undertake. The information contained in the SWP should be: a) concise and relevant to the task and location where the work is being undertaken; and Standard 019 Update Briefing b) provide clear information to allow the person in charge to effectively use it to manage the risks to themselves and those working under their supervision. 8 Currently a SSOW pack looks like…. • SSOW pack verification form • Part completed RT9909 Record of arrangements • Part completed RT3181 form(s) – where blockage(s) of the line are part of the SSOW pack • Possession arrangements SSOW • Safe access and egress information including walking to and from site • Sectional Appendix extracts showing the relevant running lines, track layout and work location for the entire mileage for which the work group will be On or Near the Line • National Hazard Directory extracts that are relevant to the work and location • Signalling or track diagrams where used • Emergency arrangements Standard 019 Update Briefing 9 What extra goes into a Safe Work Pack? Additional contents required: • SWP validation form, instead of the SSOWP verification form. • Site risk information and controls required Safe Work Pack • Task risk information and controls required e.g. task risk control sheets, work package plans or task briefing sheets • Permits, where applicable, such as lifting plans, electrical, isolation, hot works, confined spaces • Welfare arrangements and their location Standard 019 Update Briefing 10 What’s new? Hierarchy of Control – Operational Risk There are 8 Levels of hierarchy now, with a renaming of previous levels – Red & Green zone terms replaced with Protection and Warning arrangements. Same requirements are required for justification of level planned. Safe System of Work Type 1 Safeguarded site of work Protection 2 Fenced site of work Protection 3 Protection Warning systems – permanent Warning 5 Warning systems – Train Operated Warning System (TOWS) Warning 6 Warning systems – human activated equipment Warning 7 Warning systems – Portable Warning 8 Lookout warning Warning 4 Standard 019 Update Briefing OLD HIERARCHY Separated site of work 11 Step 1 - What do we associate as a risk? Site Task Operational Working at night Hazardous dust Trains Electricity Slips, trips and falls Working at height Noise Access and egress points Vibration Standard 019 Update Briefing On track machines On track plant 12 Modules in working practice Modules Ref: NR/L2/OHS/019 Issue: 9 Date: 03 July 2017 Compliance Date: 03 July 2017 Level 2 Business process Safety of People at Work On or Near the Line Standard 019 Update Briefing Module 4 Module 3 Module 2 Module 1 Planning and working using Planning and working using warning arrangements Planning andarrangments working in a possession protection Planning and working during incident response 15 Core 019 standard overview Responsible Manager The Responsible identifies The Planner willManager review SWP The Responsible Manager willand The Responsible Manager must The person in charge will the check The Planner will create the work to be undertaken, appoints the for amendments future The person inand charge will review the SWP record authorise the SWP. In for doing sothe they accept the SWP details are valid (at After work has finished the person SWP in conjunction with, and Planner and the person in charge, planning. Where a pack has not verify the Safe Work Pack details as per arrangements. are confirming that all least shift inlocal advance of theorwork) inone charge returns theoperational, used appropriate help from, the giving them suitable resources to been returned, a record must be when they are satisfied thebeen site and task risk controls and checks the Responsible Manager unused SWP back to thehave Planner. person inthe charge. produce SWP. kept the Responsible plan is appropriate. appropriately has by authorised theidentified. SWPManager. for use. Planner Person in charge Person in charge Person in charge Standard 019 Update Briefing Planner Responsible Manager 16 Module 1: Planning and working during incident response On site Planner Person in charge Responsible Manager Signaller Return Review Person in charge will send the IRP to the The person in charge shall decide what Planner (or Responsible response and resources are required for the Manager where no The person in charge shall arrange The person in charge shall arrange forfor the incident. The following must be considered: The The person Planner/Responsible in charge will be Manager The charge shall arrange for planner exists). aperson Incident Pack (IRP) to the beWhere a work groupintoResponse be briefed on the • Is protection/warning arrangements required? contacted will update as the any appropriate systems and person store Signaller to be including contacted to arrange appropriate pack hasand not been completed task, site protection/warning arrangements including •toWhat task and site The riskincident. controlscontacting are required? respond the IRP following assurance an processes. protection, if for required. person the returned by the person operational risks. task, site and operational risks. If the the Signaller is unable to provide the protection When work is complete, the person in • Identify safe systems of work and the signaller, if not required, the personinincharge charge, will act as: record arrangements person charge charge shall check the the work groupainis clear must ofshall controls required. •consider COSS using a lower level kept byinthe in the the site and the line hasbe been left a safe •protection/warning IWA Responsible If no state. They shouldhierarchy. make sure thesuitable lineManager. has •arrangement SWL (IP only) can be implemented, the person in been handed back to the Signaller where •charge PC must escalate to Route Control or the on protection has been arranged. call Responsible Manager. The Signaller shall confirm protection arrangements they are able to provide. Video Standard 019 Update Briefing 18 Over to you, what does this module mean for you? • What are we currently doing that meets the requirements in the updated 019 standard? • What's new for us in the updated 019 standard? • How can we bridge the gap that will meet the updates in the standard 019? Standard 019 Update Briefing 19 Module 2: Planning and working in a possession Create Planner Person in charge Responsible Manager Verify Authorise Accept On Site Return Review The Planner shall apply for aResponsible worksite Manager must authorise the TheSWP The Planner will create the with under possession using the SWP at least one shift in advance of the work appropriate involvement from(PPS). the possession planning system taking place. In doing so they are confirming person in charge to produce a SWP. that all operational, site and task risk controls The Theperson personinin charge, charge when will also acting This will include things such as, have been appropriately identified and the Person in charge to conduct briefings as accept COSS will sign into the are ES/SWL Person Thethe person inSWP charge indetails charge, will send when also used or Thethe Planner willunused review the SWP for welfare arrangement, the amount of been has considered: including task and site risk controls. following If Person in charge a final worksite still validto before and the theycompletes commence anyneeded, SWP acting as the COSS, Planner will (orcontact Responsible Manager amendments to support future The person in will verify the people required, tools and • charge Work content is understood by the person acting as COSS they will also brief the For cyclical and repeated tasks, the check of the SWP on site against the work Responsible (or the Manager COSS has will sign where ES/SWL no delegated Planner (IP only) exists). when work Where has aIf pack has there isn'tnot designated SWP atwork. least one shift ina advance the duration ofplanning. the in charge operational risk controls. All requiredResponsible Manager must authorise the site conditions before implementation. into authorised the ES/SWL the SWP worksite). forconfirm use The been been returned completed by the to person in charge, line aplace. record competence the Manager will ofPlanner, the the work taking • Responsible Necessary within team to paperwork must be completed before initial SWP to be implemented repeatedly ES/SWL at must least one gives shift permission advance for theout out. is clear be kept and safe byinthe before Responsible signing Manager. carry the review of the pack. undertake task work can begin. for the following periods without further COSS of the work to sign taking the Responsible RT3199. place. • identifies Task risk and specific controls are The Manager workany that authorisation: Responsible Managers will review at least 10% and sufficient needs to be undertaken andsuitable appoints the a) Twelve month period the SWP of completed and implemented SWP,them up to a when • charge, The appropriate hierarchy of Safe System Planner and the person in giving uses protection maximum of 50 packs per period. However, the green zone); of Work has been(formerly selected appropriate resources to produce the SWP andsite Responsible Manager must review allspecific SWPscontrols identified • and Any additional including operational, task risk controls. b) Six monthmade period SWP uses • aThe welfare arrangements have been where there has been change onwhen site. the identified are appropriate. warning and (formerly red zone). Video Standard 019 Update Briefing 21 Over to you, what does this module mean for you? • What are we currently doing that meets the requirements in the updated 019 standard? • What's new for us in the updated 019 standard? • How can we bridge the gap that will meet the updates in the standard 019? Standard 019 Update Briefing 22 Module 3: Planning and working using protection arrangements Create Planner Person in charge Responsible Manager Verify Authorise Accept On Site Return Review Manager must authorise the The Planner will arrangeThe for aResponsible line SWP at with least one shift in advance of the work blockage application required. The Planner will createwhen the SWP taking place. In doing so they are confirming appropriate involvement from the person that all operational, site and task risk controls The Person When person inwork charge in charge is complete, to conduct will the briefings person to produce a SWP. This will have been appropriately identified and the accept including in charge the in task SWP shall and details check site risk the controls. work group If or Person charge will are send theas, used unused The Planner will review the SWP for include things such site and task following has been considered: still acting is valid clear as and COSS, of the the site they and willwelfare the also line hasthe SWP to the Planner (or Responsible Manager amendments to support future Person in charge completes The person abrief final will verify the controls, and arrangements. •in charge Work content is understood by the person Responsible operational been of left Manager risk in aSWP controls safeexists). state. has and They if at required should where nothe planner Where athe pack has not planning. Ifone there isn't a designated check on site SWP against least shift in advance in charge authorised arrange make the sure theplanned the SWP line for line has use blockage(s). been handed been returned by the person in charge a record Planner, the Responsible Manager within team to site conditions before implementation. of the work taking place. competence • Necessary atAll least back required one to kept the shift paperwork Signaller in advance must where becarryManager. must be by the Responsible will outundertake the reviewtask of the pack. For cyclical repeated tasks, the are ofcompleted the protection work taking before hasResponsible place. been work arranged. can begin. The Manager workany that • identifies Task risk and and specific controls Responsible Managers will review atsufficient least 10% Responsible Manager must authorise the needs to be undertaken and appoints the suitable and of completed and implemented SWP, up tothen a be initial SWP whichthem can • charge, The appropriate hierarchy of Safe System Planner and the person in giving maximum of 50 packs per period. However, the implemented for a twelve month of Work hasrepeatedly been selected suitable resources to produce the SWP including Responsible Manager must review SWPs when theallSWP uses protection Any additional specific controls identified operational, task and site•period risk controls. where there has been aThe change made on site. •arrangements welfare arrangements have (formerly known asbeen green identified and are appropriate. zone) without further authorisation. Video Standard 019 Update Briefing 24 Over to you, what does this module mean for you? • What are we currently doing that meets the requirements in the updated 019 standard? • What's new for us in the updated 019 standard? • How can we bridge the gap that will meet the updates in the standard 019? Standard 019 Update Briefing 25 Module 4: Planning and working using warning arrangements Create Verify Authorise Accept On Site Return Review The Responsible Manager must authorise the Planner Person in charge Responsible Manager The Planner will create the SWP withone shift in advance of the work SWP at least appropriate involvementtaking from the place. In doing so they are confirming person in charge to produce a operational, SWP. that all site and task risk controls The person in charge This will include things such as, have been appropriately identified andwill the Person in charge to conduct briefings Planner will review the SWP for details are accept the SWP Person inwelfare chargearrangement, will send The the used or unused the amount of following has been considered: including taskisand site riskthe controls. If When work complete, person amendments to support future still and theby the person SWP to Planner (orThe Responsible Manager person inWork charge will verify the people required, tools needed, and the Person in the charge completes a final • the content isvalid understood acting as COSS they will in charge shall check thealso workbrief group planning. If charge there a designated Manager has where planner exists). Where a pack has isn't not SWP at least one shift inResponsible advance in duration of the work. check of no the SWP on site against the operational risksite controls. Allline required is clear of the and the has the Manager • taking Necessary competence within team the SWP for to use been returnedbefore by theimplementation. person in charge aResponsible recordauthorised of thePlanner, work place. site conditions paperwork bestate. completed before been left inmust a safe undertake task will carry out the review of the at least onepack. shift in advance must be kept by the Responsible Manager. work can begin. For cyclical and repeated tasks, theare • Task riskreview and specific controls of any the work place. The Responsible Responsible Manager Managers identifies will work at that least taking 10% Responsible must authorise suitable andManager sufficient needs to of be completed undertaken and and implemented appoints the SWP, up to a theThe initial SWP which can then be System •in appropriate hierarchy of Safe Plannermaximum and the person of 50 packs charge, per period. giving However, them the implemented for a six of Work has repeatedly been selected suitableResponsible resources toManager producemust the SWP review including all SWPs period when the SWP uses • month Any additional specific controls identified operational, wheretask there and has site been risk acontrols. change made on site. • warning The welfare arrangements been (formerly known redhave zone) identified and authorisation. are appropriate. without further Video Standard 019 Update Briefing 27 Over to you, what does this module mean for you? • What are we currently doing that meets the requirements in the updated 019 standard? • What's new for us in the updated 019 standard? • How can we bridge the gap that will meet the updates in the standard 019? Standard 019 Update Briefing 28 Our commitment Safe behaviour is a requirement of working for Network Rail: • We will always comply with our Lifesaving Rules. work to ensure that itunsafe can bebehaviours done safely. • We will plan use Close Calls to report and conditions. work environments will be tidy andtowe will leave incidents them tidy and when we’ve • Our We will use our Fair Culture principles investigate learn finished.to prevent them occurring again. lessons ensure people have the skills and the equipment required to work • We will relentlessly strive to find new ways to keep ourselves, colleagues, safely. passengers and the public safe. stop work if it cannot be done safely. • We will design, construct, inspect, operate and maintain the railway to keep everyone safe. • We will personally intervene if we feel a situation or behaviour might be unsafe. • Safety leadership is key to how we assess our people’s performance and readiness for progression. 29 Worksafe procedure Standard 019 Update Briefing 30 Over to you… Now that you’ve seen in full the revised 019 standard, to conclude the brief it is over to you. Discuss in your groups: 1. What you believe the key issues you will face locally? 2. Agree consensus on the top priority issues you believe need to be resolved in your area. 3. Suggest actions which could address each of your priority issues. 4. How can you individually contribute to these actions? Standard 019 Update Briefing 31 Final summary •Let’s Therecap Formally Planner there on will allwere the stillkey create 7 levels points: a of Safe hierarchy, Systemformally of Workknown pack but as will red need and green additional documents zone working. alongside Now there to create are 8 levels the Safe of hierarchy Work Pack. and These they are additional now known as • protection The person in charge is new, it’s a new capability, not a competence. documentsand are:warning arrangements. •• Incident The person in charge willisbethere appointed by the ontotheir − Safe Response Work Pack Pack validation form to enable youResponsible to plan how Manager to respond an ability to manage the work activity planned and have an understanding of the incident safely, importantly this now includes task and site risk assessments. risks. − Site risk information and controls required • The − Task person risk in information charge will and verifycontrols the Safe required Work Pack. • Person − Permits in charge must hold a minimum of a COSS competence or be a Safe Work Leader (IP only). − Welfare arrangements and location • The person in charge will make sure that all risk controls have been • Planners should planchanges for the highest of protection possible. implemented. If any need tolevel be made, these should be reported to the on call manager. • Possession planning meetings are important to deconflict between work • groups. The Responsible Manager will authorise the Safe Work Pack. Standard 019 Update Briefing 32
© Copyright 2026 Paperzz